Short answer
Every project follows six stages: discovery, a written scope with a fixed quote, design, build, content and testing, and launch with aftercare. You approve the work at the end of each stage before the next begins. For a full agency site we plan for seven to eleven weeks from first email to launch, or five to nine weeks once the scope is signed, depending mostly on how quickly content and feedback come back and how much work the CRM feed needs.
The stages at a glance
| Stage | What happens | What we plan for |
|---|---|---|
| 1. Discovery | Questions by email, a call if you want one, a look at your current site and CRM. | About one week |
| 2. Scope and quote | A written scope, page map and fixed-price proposal. | About one week |
| 3. Design | Listing template first, then the other templates, shown in a browser. | Two to three weeks |
| 4. Build | Templates built, feed connected, forms wired up. | Two to four weeks |
| 5. Content and testing | Content added, everything tested on real devices. | One to two weeks |
| 6. Launch and aftercare | Go live, redirects, monitoring and two post-launch reviews. | Launch day, then six weeks of checks |
Adding up the planning figures gives seven to eleven weeks from first email to launch, of which five to nine weeks come after the scope is signed. In practice the stages overlap a little, because content writing can start during the build.
1. Discovery
Discovery is about understanding how your agency works before thinking about how the website looks. We ask about your branches, your services, your CRM, how valuation requests and viewings are handled today, and what frustrates your team or your clients about the current site. If you have used the project planner, its brief answers most of these questions.
We also look at your current website, your listings on the portals and, for a redesign, your search console and analytics data if you are happy to share access.
From you: answers to our questions, access to analytics if relevant, and the name of your CRM provider so we can check what its feed offers.
2. Scope and quote
We write a scope document: the page map, the templates, the integrations, who writes what content, and the assumptions behind it. The proposal prices each part and lists running costs separately. The pricing page explains how.
From you: a careful read and any questions. Nothing goes ahead until you accept.
3. Design
We design the listing template first, using real examples from your current stock, because it is the most important page on the site and its fields affect everything else. Then come the home page, search results, branch pages, lettings pages, guides and forms. Designs are presented as working pages you can open on your phone, not static pictures.
From you: feedback on each round, gathered from the people who matter in your agency. Consolidated feedback in one message keeps things moving.
4. Build
Approved templates are built in clean, documented code. The listings feed is connected and tested with your live data, forms are set up to route to the right branches, and the lettings fee page is built from your actual figures. You get access to a private preview site throughout.
From you: fee figures, scheme details, branch information and team details, plus a contact at your CRM provider if the feed needs their help.
5. Content and testing
Content goes in, whether you supplied it or we wrote it with you. Then we test: every template on real phones and desktops, keyboard-only use, a screen reader, form delivery to every inbox, the feed's handling of new listings, changes and removals, and page speed against Google's Core Web Vitals thresholds.[1] Accessibility is checked against WCAG 2.2 level AA as the target.[2]
From you: a final review of the content and a sign-off for launch.
6. Launch and aftercare
We agree a launch time that suits your office, usually outside your busiest hours. At launch we switch the domain, put redirects live for a redesign, submit the sitemap, and test sample pages and forms by hand. Over the following weeks we monitor for errors, broken addresses and form problems, and send a written review at two weeks and at six weeks.
After that, the care and hosting service can take over, or we hand everything to you or your chosen host.
How we communicate
We work by email, with calls when they genuinely help, such as for discovery or design reviews. You always know which stage the project is in, what is next and what we are waiting for. If something is going to take longer than planned, you hear about it early, with the reason.
What can slow a project down
- Feedback in pieces. Several people sending separate comments on the same design leads to rework. One consolidated set per round is faster.
- Content arriving late. Branch details, fee figures and team photos are needed before the build can finish.
- Feed problems. If a CRM provider is slow to supply feed access or documentation, the listings work waits. We raise this early.
- Scope changes mid-build. These are fine, but they are priced and scheduled separately so the original work is not delayed.
Can the process be faster?
Sometimes. A smaller site with a straightforward feed and content ready to go can move more quickly. We will give you a realistic plan in the proposal.
Do we have to have calls?
No. Everything can be done by email if you prefer. Calls are offered where they save time.
Who from our agency should be involved?
One main contact who can make decisions, plus input from a branch manager or negotiator for local knowledge, and someone from lettings if you have a lettings section.
Sources
Checked on 29 October 2026. Each entry says what kind of source it is.
- Web Vitals, web.dev (Google) (platform documentation)
- Web Content Accessibility Guidelines (WCAG) 2.2, W3C (technical standard)